The Scope of the Works

A comprehensive, multi-disciplinary conceptual design, building permit level design and execution drawings (a 30 km stretch of railway and the Tłuszcz railway station):

  • railway layouts along with drainage,
  • traction work,
  • road systems and junctures,
  • energy & power for other individual and business entities and low voltage electrical power,
  • building structures, including platforms for 9 passenger stops and at the Tłuszcz train station and a signal box,
  • miscellaneous engineering structures,
  • installation works for water, sewage, gas.
Project duration

2013

The value of investments

The value of investments corresponding to the scope of the design works:

300,000,000 PLN (73,000,000 EUR)