Modernization of the E75 Rail Baltica railway line- Warsaw – Białystok - to the border with Lithuania, phase I, section from Warsaw Rembertów-Zielonka-Tłuszcz (Sadowne); railway line from km 24.450 to km 57.500, Tłuszcz train station.
The Scope of the Works
A comprehensive, multi-disciplinary conceptual design, building permit level design and execution drawings (a 30 km stretch of railway and the Tłuszcz railway station):
- railway layouts along with drainage,
- traction work,
- road systems and junctures,
- energy & power for other individual and business entities and low voltage electrical power,
- building structures, including platforms for 9 passenger stops and at the Tłuszcz train station and a signal box,
- miscellaneous engineering structures,
- installation works for water, sewage, gas.
Project duration
2013
The value of investments
The value of investments corresponding to the scope of the design works:
300,000,000 PLN (73,000,000 EUR)