The design and implementation of construction works on the railway line from Kraków-Medyka
The design and implementation of construction works on the railway line from Kraków-Medyka-(country border) along the section Podłęże-Bochnia from km 16.000 to km 39.000 within the project scope entitled "The modernization of railway line E 30/C-E 30, Krakow-Rzeszów section".
The Scope of the Works
Building permit level drawings and execution drawing documentation (branch precinct of Rudzice, 8 km section, Podłęże railway station):
- track layout and drainage,
- traction network,
- roads and crossings (1 level crossing and 8 parallel road and technological sections),
- rail traffic control,
- cable networks and railway telecommunications systems,
- energy and power for other individual and business entities along with low voltage electrical power,
- miscellaneous buildings including station platforms and signal boxes,
- dendrological reports.
Project duration
2011
The value of investments
The value of investments corresponding to the scope of the design works:
97,000,000 PLN (24,000,000 EUR)