Modernization of the E-30/C-E 30, Krakow-Rzeszow railway line-the completion of comprehensive design works’ supervision for the Sędziszów Małopolski-Trzciana (km 133.600 to km 142.400) section, for the Trzciana station (km 142.400 to km 143.900).
The Scope of the Works
Preparation of the required map underlayments for design purposes inventory works, concept design, building permit level design documentation, execution drawings:
- track layout along with drainage,
- roads and crossings,
- other engineering structures,
- building construction works,
- sanitary installations, water supply and gas lines,
- low voltage electrical power engineering,
- energy & power for other individual and business entities and low voltage electrical power needs of the line,
- traction network,
- rail traffic control systems,
- railway design related teletechnical design.
Project duration
12/2010 – 09/2012
The value of investments
The value of investments corresponding to the scope of the design works:
192,000,000 PLN (47,000,000 EUR)